Basic Description
Equipped using the zero leak bidirectional checking sole-noid valves, this energy unit is designed for your operation of two independent circuits. Which are respectively for the principal and subordinate platforms with the double scissors lift. Two cut-off valves are utilized for decreasing the machine manually in case of electrical power loss. If extra independent circuits are necessary for your application please get in touch with us for availability.
Remark: 1. Please seek the advice of our product sales engineer for that various pump displacement, motor power or tank capacity.
two. CSA or UL licensed motors can be found upon request.
Particular Notes
1. The AC motor is of S3 duty cycle, which can only operate intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean each of the hydraulic components concerned before installation of the power unit.
3. Viscosity of your oil shoud be 15~46 cst,as well as oil should be clean and free of charge of impurities,N46 hydraulic oil is proposed.
four. The power unit should be mounted vertically.
5. Check the oil degree inside the tank just after the first operating from the electrical power unit.
6. Oil changing is required following the preliminary 100 operation hours,afterwards the moment just about every 3000 hours.